Rigging and Slinging is the process of lifting and moving heavy objects using ropes, chains, or mechanical devices.
What is a rigging operation?
Rigging is both a noun, the equipment, and verb, the action of designing and installing the equipment, in the preparation to move objects. A team of riggers design and install the lifting or rolling equipment needed to raise, roll, slide or lift objects such as with a crane, hoist or block and tackle.
What is slinging in lifting?
A lifting sling is used with a lifting device or crane to lift objects effectively and safely. Slings usually consist of cable, chain, rope or webbing, and generally include metal devices such as hooks, shackles, links or rings.
What is the difference between rigging and lifting?
Rigging is used on most construction sites to move and place materials. Lifting refers to machines such as boom lifts, scissor lifts, forklifts and other types of man-lifts and aerial-lifts which are used to move crew members or material around a site.
What is basic rigging?
Introduction: This training course was developed to provide maintenance employees (Artisans) with no formal Rigger qualification, with adequate knowledge and skills to execute the required Rigging Operations safely, according to pre-set standards, to lift loads to a maximum weight of 5 Ton.
What are the two types of rigging?
Rigging is divided into two classes, standing, which supports the mast (and bowsprit), and running, which controls the orientation of the sails and their degree of reefing. Configurations differ for each type of rigging, between fore-and-aft rigged vessels and square-rigged vessels.
What is crane slinging?
(A slinger or rigger is the person who hooks loads onto cranes using various types of slings.) Inspect each item of lifting equipment before and after lifts.Signal the crane operator from only the one slinger who is in charge of lift.
What is a sling in construction?
Slings are commonly used in combination with a lifting device, such as an overhead crane, hoist, or forklift. The four main types of slings are: Wire Rope: The most commonly used sling. Used in the construction and other applications where heavy loads and rugged conditions exist.
What are the three basic types of slings?
Primarily, there are three types of slings – web slings, wire rope slings, and chain slings.
What are the Different Types of Slings?
- Web sling.
- Wire rope sling.
- Chain sling.
How many types of rigging are there?
There are two broad categories of shackles, anchor and chain, but both of these categories can also include different types of shackles: screw pin, safety, and round pin types.
What is a hoist in rigging?
Hoists are often used when materials are too heavy or bulky to be safely moved manually. Because hoists rely upon slings to hold their suspended loads, slings are the most commonly used materials-handling apparatus. Slings, chokers, shackles and hoists are are available in many different materials and styles.
What’s the difference between SWL and WLL?
“WLL” stands for “working load limit” while “SWL” stands for “safe working load.” The main differences between safe working load from working load limit is that “SWL” is the older term. Today, SWL is not used anymore because it has been completely replaced by the term WLL.
What is a Level 3 rigger?
A Rigger Level III is a rigger that can successfully demonstrate or have the knowledge of how to inspect rigging before use, identify and attach rigging with basic knowledge of hitch configurations, recognize associated hazards, signal operations, and use various types of rigging equipment and basic hitches and their
How do you calculate rigging?
One method uses a sling angle factor chart, the other, the ratio of the length of the sling divided by the height. The sling leg load of two vertical slings is one half of the total load for each sling. If the load weight is 1,000 lbs, the sling load for two vertical slings is: (1,000 lbs / 2) = 500 lbs for each sling.
What is a Level 1 rigger?
A Certified Rigger Level I can perform simple, repetitive rigging tasks when the load weight, center of gravity, the rigging, and rigging configuration are provided or known by the rigger through experience or on-the-job training prior to the rigging activities.
Who invented rigging?
The play has long since faded into obscurity, but one company will never forget it. The arrival of The Romany Rye in 1882 at a theatre in Syracuse, NY, became the catalyst for innovations in stage rigging that would change the life of a local stagehand named John R. Clancy.
What are examples of rigging equipment?
Rigging equipment is diverse and specialized for the load being moved and the environment needed to move the object. Some examples include wire rope slings, webbing slings, chain slings, metal mesh slings, spread beams, and various rigging hardware.
What are ship ropes called?
The ropes that are used when sailing are all called ‘sheets’ and each of these ‘sheets’ has their own name depending on which sail they are controlling, so when you trim the mainsail you use the ‘mainsheet’, when trimming the jib, you will adjust the ‘jibsheet’.
What is tree rigging?
Tree rigging is the art of dismantling parts of or whole trees using ropes, blocks and pulleys. It can range from large pieces of timber to awkwardly shaped branches and tight drop zones where damage has to either be kept to a minimum or eliminated entirely.
What is negative rigging?
When butt-hitching or blocking wood (which also is known as negative rigging), the anchor point of the rigging is below the rigged piece. If the piece has to be stopped quickly or “snubbed off ,” shock loading occurs, and the forces that are generated can be very great.
What is positive rigging?
Positive/Overhead Rigging – rigging point is above the piece, used whenever possible. i. Negative Rigging – rigging point is below the piece, used in the absence of other options, always involves shock loading.